Customization: | Available |
---|---|
After-sales Service: | 24h Services |
Warranty: | - |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
NO.UST20240905005H
The UST20 is a key piece of equipment designed for working at height, providing a stable and safe working platform for aerial tasks such as building construction, maintenance and installation. Its flexibility and accessibility makes working at height more efficient while reducing risks during operations. In addition, aerial work trucks are commonly used in a variety of applications such as cleaning, painting, billboard installation and emergency rescue. By offering a wide range of configurations and features, aerial work trucks are able to meet the diverse needs of different industries and specific job requirements.
Chassis | Shaanxi Delong / Sinotruk HOWO |
|||||||
Total Mass (kg) |
4495 | |||||||
Overall mass (kg) |
4300 | |||||||
Engine | YN25PLUS160A Yunnei 160hp | |||||||
Transmission | Fast C8J45TB with Power Take-Off (PTO) | |||||||
Wheelbases(mm) | 3360 | |||||||
Overall Dimension(mm) |
5995mm*2200mm*2900mm | |||||||
Front/Rear Axle |
Hande HDZ 2.5t/5t(maintenance-free for two years or 120,000 km) | |||||||
Tires | Z00R16LT | |||||||
Brake | Air brake(when driving) | |||||||
Other | air-conditioning,power windows and doors,central locking,Delong 1995 wide body,leaf springs 3/5+2, frame width 800mm-single layer 5mm |
|||||||
Transverse span between front and rear outriggers | 5150mm/4500mm | |||||||
Longitudinal span between front and rear outriggers | 3400mm | |||||||
Tops UST20 aerial work vehicle |
Maximum operating height (m) | 19 | ||||||
Maximum working radius(m) | 14 | |||||||
Platform rated load (kg) |
200 | |||||||
Boom slewing angle | 360° | |||||||
Platform size(mm) | 1500mm*700mm*1100mm | |||||||
Platform rotation range | Infinite 360°rotation |
|||||||
Boom arm | 6-section arm,5 sections synchronized telescopic,wire rope out of the arm with a spare wire rope,even if the main wire rope is disconnected, you can still put people down smoothly |
|||||||
Operating system | Domestic well-known electronic contol system,equipped with wireless remote control,three-way operation |
|||||||
Hydraulic system | Electro-hydraulic proportional valve with infnitely variable speed control | |||||||
Hydraulic legs | H-shaped legs,4 telescopic legs,individuallyadjustable.Fully enclosed legs for greater stability |
|||||||
Safety device | Upper and lower car interlock,limit protection,bi-directional hydraulic balancing valve |
|||||||
Truck Cranes | Maximum lifting capacity (kg) (kg) |
4000 | ||||||
Main winch | 4T | |||||||
Crane arm | 6-section arm 6 |
|||||||
Max lifting height(m) (m) |
17 | |||||||
Rotary structure | Arbitrary rotation of 360 degrees 360 |
|||||||
Power pump | Single pump | |||||||
Truck-mounted Crane Carrier | Plate size (mm) (mm) |
3300mm*2200mm | ||||||
Operating method | Intermediate operation |
Complete production line, combined with mechanized operation and detailed differentiation.
1.Preparation of packaging materials: Choose suitable packaging methods according to the characteristics of the goods and use shockproof and moisture-proof materials, such as reinforced cardboard boxes, plastic parcels, buffer materials, etc., in order to adapt to different transport conditions.
2.Product inspection: carry out exhaustive quality check on all items before packing to ensure that every product meets the shipping standard.
3.Product Packaging: Professional packaging techniques and materials are utilised to ensure that each product is secure and safe during transport, reducing damage caused by friction, impact or pressure.
4.Containerisation: The tightly packed goods are loaded into containers in an orderly manner, and fixing straps or padding are used to ensure that they do not move and prevent mutual collision in the course of transport.
5.Shipping Arrangement: Based on the destination of the goods, time requirement and cost consideration, select the best transport scheme and carrier, arrange reasonable shipping time and ensure shipment on schedule.
6.Tracking and Confirmation: Using modern logistics management system and confirming the receipt of goods with customers after their arrival to ensure transparent communication.
7.After-sales service: establish a perfect customer service system, respond to customer feedback and needs in a timely manner, and enhance customer satisfaction and loyalty.